OBJECTIVE
I
am seeking a career where I can add value and continuously apply my acquired
skills, education and experience in Project Management, Engineering &
Information Technology. My strong work ethics, integrity and ability to
communicate effectively and work with culturally diverse teams and clients
will be beneficial to any organization.
EDUCATION
Bachelor
of Engineering in Electrical / Electronic Engineering (B.Eng.)
University of Ibadan, Nigeria- March 1997.
TECHNICAL SKILLS
·
Proficient in Primavera
P6 v6.2 and just completed training on v8.2
·
Microsoft office suite
(Excel, Words, Power Point and Microsoft Projects 2010).
·
SAP and Earned Value
Management (EVM).
WORK EXPERIENCE
Cameron
– Project Planner / Scheduler (Houston,
Texas - May 2012 to Date)
·
Responsible for
supporting the project team by utilizing project planning documents and
output from the interactive planning process as a basis for developing
project schedules from proposal phase to project closing keeping company
standards and client requirements into consideration.
·
Obtain Input from
project team members, subcontractors, vendors and clients to support the
development of the project schedule and subsequently update the schedule
progress and forecasting.
·
Build work packages /
systems schedule including logic, critical path, float, resource loading,
weighting etc and report deviation to appropriate cost control group and
project management.
·
Ensure that contractual
terms and conditions in the project schedule baseline are monitored and met
during project execution.
·
Develop and update
resource critical path method (CPM) project schedules as required on a timely
basis.
·
In conjunction with the
Risk Manager, Perform Risk schedule Analysis as required by project
management.
·
Evaluate schedule
alternatives to support project changes making sure that internal and
external changes are recognized, captured, analyzed and reported to project
management expeditiously.
·
Evaluate potential
schedule impacts from schedules and progress of engineering and design,
procurement, fabrication, commissioning and project execution.
·
Prepare and provide
timely project status, analysis and reporting to the project team such as
progress s-curves, variance reports, forecast, Earned Value (EV), Estimate at
Complete (EAC), mitigation plans, manpower histogram, Engineering KPI and
customized reports as required by project management.
·
Develop, maintain and
champion designated Global planning and scheduling work procedures, practices
and instruction and to standardize schedules.
·
Global planning /
scheduling continuous process Improvement.
National
Engineering & Technical Company (NETCO) – Project Planner
(Lagos, Nigeria - August 2010 to April 2012)
·
Participated in the
development of Processes, Procedures and best practice for the project
planning and scheduling functions throughout NETCO.
·
Data Gathering and
Database Setup (Gather data on planning, Setup database for product schedules
(template setup), revise and update control procedure/manual )
·
Ensures that project
planning and scheduling functions provide reliable high quality services and
products to satisfy the customer needs.
·
Maintain and update
project plans to ensure proper sequence of execution.
·
Participated and
supported proposal efforts and develop holistic project planning and
scheduling functions.
·
Ensures that all
projects scheduling team complies with all NETCO process solution operating
guidelines and standards.
National
Engineering & Technical Company (NETCO) – Project
Scheduler (Lagos, Nigeria - May 2006 to August
2010)
·
Created and set a
baseline schedule for EPC schedule detailing the sequence of all work to be
performed.
·
Ensures that baseline
is achieved through the use of approved change order / variance procedures.
·
Update and progress the
project schedule and identify the impact of work performed and not performed
as scheduled.
·
Incorporated resource
and / or Man hour data into project schedule as required.
·
Publish monthly project
reports such as progress curves, look ahead and critical path schedule and
man power resource requirements.
·
Assist the project
manager in creating short term schedule, monitor such schedule to determine
impact on master schedule and help in formulating actions to correct
scheduling problems.
·
Provide information as
needed on the content, modification or presentation of project schedule.
Citibank
Nigeria – IT Network Analyst (Lagos,
Nigeria - July 1997 to April 2006)
·
Monitor and analyze
network performance across the organization’s LANs, WANs, and wireless
deployments.
·
Ensure the stable
operation and efficient performance of company networks.
·
Monitor system capacity
to determine its effect on performance and recommend enhancements to meet new
or changing network demands.
·
Identify and remedy
network performance bottlenecks.
·
Configure and
troubleshoot servers, including e-mail, print and backup servers and their
associated operating systems and software.
·
Install and configure
all network hardware and equipment, including routers, switches, hubs, UPSs,
and so on.
·
Inspect, maintain, and
where necessary replace network cabling, voice/data jacks, and other
network-related equipment.
·
Ensure network and IP
connectivity of all workstations, application servers, and back-end office
infrastructure.